Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Jungle mountains challenge Brazil oil line construction. [84-km line from Sao Sebastiano to Guararema]

Journal Article · · Pipe Line Ind.; (United States)
OSTI ID:7192246

Construction crews had their ups and downs while building an 84-km (52-mi.) crude oil trunkline for Petroleo Brasiliero in the Serra do Mar region of Brazil's State of Sao Paulo. The system begins at a tanker terminal and storage facility on the South Atlantic coast at Sao Sebastiano and extends inland to a storage plant at Guararema. The right of way is through a mountainous area with steep slopes and knife-edged ridges in a tropical jungle. Near the coast the climate is damp and rainy during most of the year. Inland it is wetter. On an average of 252 days per year and 150 to 250 cm (59 to 98 in.) of rain falls on this zone. Construction got under way in January 1975 and was completed in March 1976. Numerous grades of 50 percent were encountered and frequently, where the line was built along a ridgecrest, sections of the ROW were bordered by nearly vertical drops from 15 to 30 m (50 to 100 ft.) or more.

OSTI ID:
7192246
Journal Information:
Pipe Line Ind.; (United States), Journal Name: Pipe Line Ind.; (United States) Vol. 44:6; ISSN PLINA
Country of Publication:
United States
Language:
English

Similar Records

Atlantic tropical forest mapping in the northern coastal zone of Sao Paulo State, Brazil
Conference · Sun Jun 01 00:00:00 EDT 1997 · OSTI ID:478176

Bolivia-Brazil gas line route detailed
Journal Article · Mon May 11 00:00:00 EDT 1992 · Oil and Gas Journal; (United States) · OSTI ID:5354712

Environmental benefits of replacing fuel oil by natural gas in the metropolitan region of Sao Paulo, Brazil
Conference · Wed Dec 30 23:00:00 EST 1998 · OSTI ID:682181