Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Horizontal slim-hole drilling with coiled tubing; An operator's experience

Journal Article · · Journal of Petroleum Technology; (United States)
OSTI ID:7191308
What is believed to be the first horizontal well drilled with directionally controlled coiled tubing recently was completed in the Austin Chalk formation. an existing well was sidetracked out of 4 1/2-in. casing with a conventional whipstock. an average build rate of 15[degrees]/100 ft was achieved in the curve, and a 1,458-ft vertical section was drilled with 2-in. coiled tubing, downhole mud motors, wireline steering tools, a mechanical downhole orienting tool, and 3 7/8-in. bits. This paper discusses the orienting and directional tools and techniques developed during this operation. It also describes improvements made for the second well.
OSTI ID:
7191308
Journal Information:
Journal of Petroleum Technology; (United States), Journal Name: Journal of Petroleum Technology; (United States) Vol. 44:10; ISSN JPTJAM; ISSN 0022-3522
Country of Publication:
United States
Language:
English

Similar Records

Technology vital for horizontal well success
Journal Article · Sun Dec 10 23:00:00 EST 1995 · Oil and Gas Journal · OSTI ID:136992

Sidetracking technology for coiled tubing drilling
Conference · Sat Dec 30 23:00:00 EST 1995 · OSTI ID:166610

Coiled tubing sidetrack: Slaughter Field case history
Journal Article · Tue Feb 28 23:00:00 EST 1995 · SPE Drilling and Completion · OSTI ID:39907