Ramos, A.B. Jr., Faahel, R.A., Chaffin, M.G., and Pulis, K.H.. Horizontal slim-hole drilling with coiled tubing; An operator's experience. United States: N. p., 1992.
Web.
Ramos, A.B. Jr., Faahel, R.A., Chaffin, M.G., & Pulis, K.H.. Horizontal slim-hole drilling with coiled tubing; An operator's experience. United States.
Ramos, A.B. Jr., Faahel, R.A., Chaffin, M.G., and Pulis, K.H.. Thu .
"Horizontal slim-hole drilling with coiled tubing; An operator's experience". United States.
doi:.
@article{osti_7191308,
title = {Horizontal slim-hole drilling with coiled tubing; An operator's experience},
author = {Ramos, A.B. Jr. and Faahel, R.A. and Chaffin, M.G. and Pulis, K.H.},
abstractNote = {What is believed to be the first horizontal well drilled with directionally controlled coiled tubing recently was completed in the Austin Chalk formation. an existing well was sidetracked out of 4 1/2-in. casing with a conventional whipstock. an average build rate of 15[degrees]/100 ft was achieved in the curve, and a 1,458-ft vertical section was drilled with 2-in. coiled tubing, downhole mud motors, wireline steering tools, a mechanical downhole orienting tool, and 3 7/8-in. bits. This paper discusses the orienting and directional tools and techniques developed during this operation. It also describes improvements made for the second well.},
doi = {},
journal = {Journal of Petroleum Technology; (United States)},
number = ,
volume = 44:10,
place = {United States},
year = {Thu Oct 01 00:00:00 EDT 1992},
month = {Thu Oct 01 00:00:00 EDT 1992}
}