Operating experience with high beam currents and transient beam loading in the SLC damping rings
Conference
·
OSTI ID:71394
During the 1994 SLC run the nominal operating intensity in the damping rings was raised from 3.5 {times} 10{sup 10} to greater than 4 {times} 10{sup 10} particles per bunch (ppb). Stricter regulation of rf system parameters was required to maintain stability of the rf system and particle beam. Improvements were made in the feedback loops which control the cavity amplitude and loading angles. Compensation for beam loading was also required to prevent klystron saturation during repetition rate changes. To minimize the effects of transient loading on the rf system, the gain of the direct rf feedback loop and the loading angles were optimized.
- Research Organization:
- Stanford Linear Accelerator Center, Menlo Park, CA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC03-76SF00515
- OSTI ID:
- 71394
- Report Number(s):
- SLAC-PUB--95-6891; CONF-950512--98; ON: DE95012563
- Country of Publication:
- United States
- Language:
- English
Similar Records
Transient beam loading in the SLC Damping Rings
Damping ring rf system for SLC
Klystron power specifications based on transient beam loading analysis in damping rings
Conference
·
Mon May 01 00:00:00 EDT 1995
·
OSTI ID:108210
Damping ring rf system for SLC
Conference
·
Fri Dec 31 23:00:00 EST 1982
·
OSTI ID:6004738
Klystron power specifications based on transient beam loading analysis in damping rings
Conference
·
Thu Jun 01 00:00:00 EDT 1995
·
OSTI ID:238603