Inland Steel's No. 7 blast furnace third reline

Conference · · Iron and Steel Engineer; (United States)
OSTI ID:7136834
 [1]; ;  [2]
  1. Inland Steel Flat Products Co., East Chicago, IN (United States)
  2. Inland Steel Co., East Chicago, IN (United States)

The background information, investigation and benchmarking that led to a decision by Inland Steel to partially reline No. 7 blast furnace is covered. This approach reduced actual downtime on the furnace and extended the current campaign. This alternative allowed for the rebalancing of the physical plant of No. 7 blast furnace. Areas of scope covered are hearth, stack, stoves, gas cleaning and furnace top. Included are highlights of the execution of the project including schedules, blowdown, salamander tap, quench, dig out/descale, scaffolding used and brick installation. A summary of the actual results of the work is presented along with information on production planned, blow-in and the first 20 days of production.

OSTI ID:
7136834
Report Number(s):
CONF-9409223--
Journal Information:
Iron and Steel Engineer; (United States), Journal Name: Iron and Steel Engineer; (United States) Vol. 71:9; ISSN IRSEA5; ISSN 0021-1559
Country of Publication:
United States
Language:
English

Similar Records

Partial reline of Inland`s No. 7 blast furnace
Journal Article · Sun Oct 01 00:00:00 EDT 1995 · Iron and Steel Engineer · OSTI ID:131722

Blow-down and blow-in of Inland`s No. 7 blast furnace
Conference · Thu Nov 30 23:00:00 EST 1995 · OSTI ID:129079

Objectives/construction of C-4 reline at Bethlehem`s Burns Harbor Div.
Journal Article · Sat Jul 01 00:00:00 EDT 1995 · Iron and Steel Engineer · OSTI ID:118850