The background information, investigation and benchmarking that led to a decision by Inland Steel to partially reline No. 7 blast furnace is covered. This approach reduced actual downtime on the furnace and extended the current campaign. This alternative allowed for the rebalancing of the physical plant of No. 7 blast furnace. Areas of scope covered are hearth, stack, stoves, gas cleaning and furnace top. Included are highlights of the execution of the project including schedules, blowdown, salamander tap, quench, dig out/descale, scaffolding used and brick installation. A summary of the actual results of the work is presented along with information on production planned, blow-in and the first 20 days of production.
- OSTI ID:
- 7136834
- Report Number(s):
- CONF-9409223--
- Journal Information:
- Iron and Steel Engineer; (United States), Journal Name: Iron and Steel Engineer; (United States) Vol. 71:9; ISSN IRSEA5; ISSN 0021-1559
- Country of Publication:
- United States
- Language:
- English
Similar Records
Blow-down and blow-in of Inland`s No. 7 blast furnace
Objectives/construction of C-4 reline at Bethlehem`s Burns Harbor Div.