Cost and performance for commercial applications of Texaco-based gasification/combined-cycle plants. Volume 1. Summary and discussion of results. Final report
Technical Report
·
OSTI ID:7128903
This report presents the results of a study conducted by Fluor Engineers, Inc. for EPRI to develop a current estimate of the performance and cost of a mature, Texaco-based integrated coal gasification-combined-cycle (IGCC) power plant. Both Texaco, Inc. and the General Electric Company were major participants during the entire course of the effort. Consequently, all designs presented in this study use the most recent data available from Texaco's ongoing international coal gasification development program and General Electric's continuing gas turbine development efforts. Three basic IGCC plant configurations were studied. The major difference in these configurations is the level of heat recovery from the gas immediately downstream of the gasifier. A major conclusion of this comprehensive study is that Texaco-based IGCC power plants have the potential to be 10% more efficient than conventional subcritical coal-fired steam plants designed to comply with current federal environmental regulations when firing Illinois No. 6 coal. Furthermore, the IGCC systems have the potential to be capital cost competitive with conventional coal-fired steam plants while providing up to 15% reductions in levelized costs of electricity as well as substantial reductions in both SO/sub x/ and NO/sub x/ emissions. The report has been prepared in two volumes. Volume 1 provides an overall summary and discussion of the major results. Volume 2 includes the design, performance, cost, and other backup details that were used in arriving at the results and conclusions presented in Volume 1. 19 figures, 9 tables.
- Research Organization:
- Fluor Engineers, Inc., Irvine, CA (USA)
- OSTI ID:
- 7128903
- Report Number(s):
- EPRI-AP-3486-Vol.1; ON: TI84920367
- Country of Publication:
- United States
- Language:
- English
Similar Records
Cost and performance for commercial applications of Texaco-based gasification-combined-cycle plants. Volume 2. Design details. Final report
An evaluaton of integrated-gasification-combined-cycle and pulverized-coal-fired steam plants: Volume 2, Sensitivity studies and appendixes: Final report
Coal gasification combined cycle power plants: a flexible option for the 1990s
Technical Report
·
Sat Mar 31 23:00:00 EST 1984
·
OSTI ID:6958662
An evaluaton of integrated-gasification-combined-cycle and pulverized-coal-fired steam plants: Volume 2, Sensitivity studies and appendixes: Final report
Technical Report
·
Thu Sep 01 00:00:00 EDT 1988
·
OSTI ID:6815883
Coal gasification combined cycle power plants: a flexible option for the 1990s
Journal Article
·
Wed Oct 31 23:00:00 EST 1984
· Power Eng.; (United States)
·
OSTI ID:5857056
Related Subjects
01 COAL, LIGNITE, AND PEAT
010404* -- Coal
Lignite
& Peat-- Gasification
20 FOSSIL-FUELED POWER PLANTS
200102 -- Fossil-Fueled Power Plants-- Power Cycles
AMBIENT TEMPERATURE
COAL GASIFICATION
COMBINED-CYCLE POWER PLANTS
COST
DESIGN
ECONOMIC ANALYSIS
ECONOMICS
ENERGY RECOVERY
GASIFICATION
HEAT RECOVERY
POWER PLANTS
RECOVERY
TEMPERATURE EFFECTS
TEXACO GASIFICATION PROCESS
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
010404* -- Coal
Lignite
& Peat-- Gasification
20 FOSSIL-FUELED POWER PLANTS
200102 -- Fossil-Fueled Power Plants-- Power Cycles
AMBIENT TEMPERATURE
COAL GASIFICATION
COMBINED-CYCLE POWER PLANTS
COST
DESIGN
ECONOMIC ANALYSIS
ECONOMICS
ENERGY RECOVERY
GASIFICATION
HEAT RECOVERY
POWER PLANTS
RECOVERY
TEMPERATURE EFFECTS
TEXACO GASIFICATION PROCESS
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES