Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Tube bank metal wastage in the Grimethorpe PFBC. [Pressurized fluidized-bed combustor]

Journal Article · · Mater. Compon. Fossil Energy Appl.; (United States)
OSTI ID:7127171
The 2 m x 2 m PFBC facility at Grimethorpe, England is designed to explore the pressurized fluidized-bed combustion of coal over a wide range of conditions. A significant degree of metal wastage was observed on the fireside surfaces of the tube bank which occurred during 468 coal-burning hours of hot shakedown and hot commissioning testing. This paper described the operating conditions during testing, the erosion of the metal surfaces, and the repair and modifications undertaken. 1 reference, 4 figures, 2 tables.
OSTI ID:
7127171
Journal Information:
Mater. Compon. Fossil Energy Appl.; (United States), Journal Name: Mater. Compon. Fossil Energy Appl.; (United States) Vol. 48; ISSN MCFAD
Country of Publication:
United States
Language:
English