Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Prospects for 6 to 10 tesla magnets for a TEVATRON upgrade

Technical Report ·
DOI:https://doi.org/10.2172/7126890· OSTI ID:7126890
The first SSC physics is at least 10 years away. An upgrade of the Fermilab Tevatron will ensure the continuity of a vigorous high-energy physics program until the SSC turns on. Three basic proposals are under consideration: /bar p/p at 3 /times/ 10/sup 31/ --Increase luminosity by improvements to the p source. pp at 1 TeV and 2 /times/ 10/sup 32/--Move the main ring to a new tunnel, build a second Tevatron ring, and /bar p/p > 1.5 TeV and 7 /times/ 10/sup 30/--Replace the tevatron with a higher energy ring. The last two options requires about a hundred 6.6-tesla dipoles in addition to a ring of Tevatron strength (4.4 T) magnets. These higher-field magnets are necessary in both rings to lengthen the straight sections in order to realize the collision optics. The third option requires a ring of magnets of 6.6 T or slightly higher to replace the present Tevatron plus a number of special 8--9 tesla magnets. The viability of the high-energy option then depends on the practicality of sizable numbers of reliable 8--9 tesla dipoles as well as 800 6.6-tesla dipoles. The following develops a specification for an 8.8 T dipole, examines the design considerations and reviews the current state of high-field magnet development. 22 figs., 3 tabs.
Research Organization:
Fermi National Accelerator Lab., Batavia, IL (USA)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
7126890
Report Number(s):
FNAL-TM-1533; ON: DE88015527
Country of Publication:
United States
Language:
English