Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Compilation of data from EBR-II natural-circulation-test procedure EX-140, Section IV, Addendum 8

Technical Report ·
DOI:https://doi.org/10.2172/711589· OSTI ID:711589

The transition from forced to natural-circulation flow of primary coolant after the loss of primary pumping power with concomitant reactor scram has been investigated in Experimental Breeder Reactor No. II. Before the loss-of-flow transient, the reactor was operated at 22.3 MWt (37.2% of the normal full-power value) and at 39.3% of normal full flow. The effects of inter- and intrasubassembly heat transfer in reducing temperature gradients in the primary system were again observed. Consequences of the delayed secondary-system flow coastdown on the natural-circulation flows and temperatures in the primary system were also measured. Data were collected by the EBR-II data-acquisition system from the usual plant process instrumentation and instrumented subassembly XX08. The method used to correct the data for signal offsets is discussed. The corrected test data are presented graphically.

Research Organization:
Argonne National Lab., IL (United States)
Sponsoring Organization:
USDOE
DOE Contract Number:
W-31109-ENG-38; NONE
OSTI ID:
711589
Report Number(s):
ANL/EBR--112; 194310
Country of Publication:
United States
Language:
English