Low-btu gasifier wastewater treatability: Phase III pilot plant study at Holston Army Ammunition Plant. Final draft report
Technical Report
·
OSTI ID:71149
A pilot plant was established to treat the wasteswater from the low-BTU coal gasification process at the Holston Army Ammunition Plant (HAAP) in Kingsport, Tennessee. The treatment program, conducted over a two-month operating period, consisted of rough filtration, dephenolization, ammonia stripping, biological oxidation, granular-media filtration and adsorption.
- Research Organization:
- Radian Corp., Research Triangle Park, NC (United States)
- OSTI ID:
- 71149
- Report Number(s):
- PB--95-207692/XAB; CNN: Contracts EPA-68-01-6700, EPA-68-01-7153
- Country of Publication:
- United States
- Language:
- English
Similar Records
Limited energy studies, Holston Army Ammunition Plant, Kingport, Tennessee. Final report
Energy Engineering Analysis Program study, Holston Army Ammunition Plant, Kingsport, Tennessee. Executive summary
Energy conservation investment program, FY95 limited energy study area B nitric acid production facilities Holston Army Ammunition Plant Kingsport, Tennessee
Technical Report
·
Sat Aug 01 00:00:00 EDT 1992
·
OSTI ID:564663
Energy Engineering Analysis Program study, Holston Army Ammunition Plant, Kingsport, Tennessee. Executive summary
Technical Report
·
Fri Dec 31 23:00:00 EST 1982
·
OSTI ID:564243
Energy conservation investment program, FY95 limited energy study area B nitric acid production facilities Holston Army Ammunition Plant Kingsport, Tennessee
Technical Report
·
Sat Dec 30 23:00:00 EST 1995
·
OSTI ID:564255