Analysis of inservice inspection relief requests
Technical Report
·
OSTI ID:7102622
Nuclear Regulatory Commission (NRC) regulations require inspection (ISI) of boiling or pressurized water-cooled nuclear power plants be performed in accordance with a referenced edition and addenda of Section XI, Rules for Inservice Inspection of Nuclear Power Plant components,'' of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code. The regulations permit licensees to request relief from the NRC from specific ASME Code requirements that are determined to be impractical for the specific licensee. The NRC evaluates these requests and may grant such relief, but the NRC may also impose alternative or augmented inspections to assure structural reliability. The purpose,of this task was to evaluate the basis for ISI nondestructive examination (NDE) relief requests and to evaluate the effect of proposed ASME Code changes that would reduce the need for such requests or provide for more complete information in relief requests. This report contains the results of an analysis of an ISI relief request data base that has been expanded to include 1195 ISI relief requests versus the 296 relief requests covered in the first report in April 1987, EGG-SD-7430. Also relief requests were added to the data base which came from both first and second 10-year inspection intervals for several facilities. This provided the means to analyze the effect of recently approved ASME Code cases and updated Code requirements, some of which have been published as a result of earlier work on this task.
- Research Organization:
- EG and G Idaho, Inc., Idaho Falls, ID (United States)
- Sponsoring Organization:
- NRC; Nuclear Regulatory Commission, Washington, DC (United States)
- DOE Contract Number:
- AC07-76ID01570
- OSTI ID:
- 7102622
- Report Number(s):
- EGG-MS-8637; ON: TI92019692
- Country of Publication:
- United States
- Language:
- English
Similar Records
Analysis of inservice inspection relief requests
Analysis of preservice inspection relief requests and recommendations for ASME code changes
Technical evaluation report on the Third 10-year Interval Inservice Inspection Program Plan: Florida Power and Light Company, Turkey Point Nuclear Power Plant, Units 3 and 4 (Docket Numbers 50-250 and 50-251)
Technical Report
·
Tue Aug 01 00:00:00 EDT 1989
·
OSTI ID:10172849
Analysis of preservice inspection relief requests and recommendations for ASME code changes
Technical Report
·
Wed May 01 00:00:00 EDT 1985
·
OSTI ID:5698841
Technical evaluation report on the Third 10-year Interval Inservice Inspection Program Plan: Florida Power and Light Company, Turkey Point Nuclear Power Plant, Units 3 and 4 (Docket Numbers 50-250 and 50-251)
Technical Report
·
Tue Jan 31 23:00:00 EST 1995
·
OSTI ID:34458
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210100 -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
210700* -- Nuclear Power Plants-- Regulation & Licensing
BWR TYPE REACTORS
DATA BASE MANAGEMENT
ENRICHED URANIUM REACTORS
IN-SERVICE INSPECTION
INSPECTION
LICENSING
MANAGEMENT
NUCLEAR FACILITIES
NUCLEAR POWER PLANTS
POWER PLANTS
POWER REACTORS
PWR TYPE REACTORS
REACTOR COMPONENTS
REACTOR LICENSING
REACTORS
REGULATIONS
STANDARDS
THERMAL POWER PLANTS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS
210100 -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
210700* -- Nuclear Power Plants-- Regulation & Licensing
BWR TYPE REACTORS
DATA BASE MANAGEMENT
ENRICHED URANIUM REACTORS
IN-SERVICE INSPECTION
INSPECTION
LICENSING
MANAGEMENT
NUCLEAR FACILITIES
NUCLEAR POWER PLANTS
POWER PLANTS
POWER REACTORS
PWR TYPE REACTORS
REACTOR COMPONENTS
REACTOR LICENSING
REACTORS
REGULATIONS
STANDARDS
THERMAL POWER PLANTS
THERMAL REACTORS
WATER COOLED REACTORS
WATER MODERATED REACTORS