Post test valve examination of Sargent Globe valve
The examination was made to observe and record any abnormalities caused by verification testing in liquid sodium which simulated 20 years of reactor service in FFTF and LMFBRs. The test program consisted of gas leakage measurements before and after a series of closing and opening actuations and thermal transient cycle exposures. External loads were used to simulate flow-induced vibration. Recommendations are given for applying these valves to future sodium systems. (23 figures) (DCL)
- Research Organization:
- Hanford Engineering Development Lab., Richland, WA (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- AC06-76FF02170
- OSTI ID:
- 709514
- Report Number(s):
- HEDL-TC-761-1
- Resource Relation:
- Other Information: PBD: Mar 1977
- Country of Publication:
- United States
- Language:
- English
Similar Records
Summary test report W-K-M Pow-R-Seal Gate Valve METC SOA Test Valve No. A-22 state-of-the-art lockhopper valve-testing and development project
Examination of a 15. 24-cm ball valve from the Morgantown Energy Technology Center Lock Hopper Valve Testing and Development Project: failure analysis report
W-K-M Dyna-Seal Ball Valve METC SOA Test Valve No. A-7, state-of-the-art lockhopper valve-testing and development project. Summary test report
Technical Report
·
Wed Apr 01 00:00:00 EST 1981
·
OSTI ID:709514
+5 more
Examination of a 15. 24-cm ball valve from the Morgantown Energy Technology Center Lock Hopper Valve Testing and Development Project: failure analysis report
Technical Report
·
Tue Jan 01 00:00:00 EST 1980
·
OSTI ID:709514
W-K-M Dyna-Seal Ball Valve METC SOA Test Valve No. A-7, state-of-the-art lockhopper valve-testing and development project. Summary test report
Technical Report
·
Mon Dec 01 00:00:00 EST 1980
·
OSTI ID:709514
+5 more