Detailed work plan No. 16: control rod worth measurements in ZPPR-13B/1
The broken-cylindrical-blanket configuration of ZPPR-13, designated ZPPR-13B/1, will be used to measure the worths of an extensive set of mockup control rods. Two basic sets of measurements are planned, one in which two-by-two drawer control rods will be substituted for fuel, and one in which two-by-three drawer control rods or control rod positions are substituted for fuel.
- Research Organization:
- Argonne National Lab., Idaho Falls, ID (United States)
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- W-31109-ENG-38
- OSTI ID:
- 708859
- Report Number(s):
- ZPR-I-Memo--427; ON: TI83026098
- Country of Publication:
- United States
- Language:
- English
Similar Records
ZPPR assembly 13 - detailed work plan No. 18: transformation from 13B/1 to 13B/2
ZPPR assembly 13. Detailed work plan No. 19: transformation from 13B/2 to 13B/3
ZPPR Assembly 13 - detailed work plan No. 26: control-rod worth measurements in ZPPR-13B/4
Technical Report
·
Mon Mar 14 23:00:00 EST 1983
·
OSTI ID:708862
ZPPR assembly 13. Detailed work plan No. 19: transformation from 13B/2 to 13B/3
Technical Report
·
Tue Apr 12 23:00:00 EST 1983
·
OSTI ID:708863
ZPPR Assembly 13 - detailed work plan No. 26: control-rod worth measurements in ZPPR-13B/4
Technical Report
·
Mon Jun 06 00:00:00 EDT 1983
·
OSTI ID:709226