Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Vacuum system for the KEK proton synchrotron

Conference · · IEEE Trans. Nucl. Sci.; (United States)
OSTI ID:7087262
The construction and characteristic points of the vacuum system of KEK 12 GeV proton synchrotron are reported. The whole system is divided into three parts, i.e., for the injector and the beam transportation line to the booster, for the booster and transportation line to the main ring, and for the main ring. Of these, only the last two vacuum systems are reported. In the design and construction, many new attempts were made, and some of them are reported. The designed value of the average pressures in the booster and in the main ring are 4 x 10/sup -4/ Pa and 1 x 10/sup -4/ Pa respectively. These values correspond to the beam lives of 300 ms (in the booster) and 10 s (in the main ring), for a beam with injection energies of 20 MeV and 500 MeV respectively. Actually, the average pressures of 6 x 10/sup -5/ Pa in the booster and 3 x 10/sup -5/ Pa in the main ring are accomplished, which are much less than the designed value.
Research Organization:
National Lab. for High Energy Physics, Ibaraki, Japan
OSTI ID:
7087262
Conference Information:
Journal Name: IEEE Trans. Nucl. Sci.; (United States) Journal Volume: NS-24:3
Country of Publication:
United States
Language:
English

Similar Records

Synchronous transfer of beam from the booster to the main ring in the KEK proton synchrotron
Conference · Wed Jun 01 00:00:00 EDT 1977 · IEEE Trans. Nucl. Sci.; (United States) · OSTI ID:7282665

KEK fast cycling booster
Conference · Wed Jun 01 00:00:00 EDT 1977 · IEEE Trans. Nucl. Sci.; (United States) · OSTI ID:7285617

rf acceleration in KEK booster
Conference · Wed Jun 01 00:00:00 EDT 1977 · IEEE Trans. Nucl. Sci.; (United States) · OSTI ID:7210354