Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Clinch River Breeder Reactor Plant. Final technical report. Volume 1

Technical Report ·
DOI:https://doi.org/10.2172/708397· OSTI ID:708397
This technical report summarizes the work done on the major systems of the Nuclear Steam Supply System (NSSS) of the Clinch River Breeder Reactor Plant (CRBRP). Emphasis is placed on describing the basis for design features and approaches rather than details of design; key problems are identified and the resolutions described and the final status of the systems/components is given together with outstanding items remaining at project termination. Extensive references to the CRBRP data base are given at the end of each section or major sub-section. These references are available/accessible through the Department of Energy Technical Information Center, unless another source is identified.
Research Organization:
Westinghouse Electric Corp., Madison, PA (United States). Advanced Energy Systems Div.
Sponsoring Organization:
USDOE
DOE Contract Number:
AC15-76CL50003
OSTI ID:
708397
Report Number(s):
WARD-D--0340-Vol.1; ON: TI85028077
Country of Publication:
United States
Language:
English