Large, live line rehab project requires detailed planning

Journal Article · · Pipe Line Industry; (United States)
OSTI ID:7066518
 [1];  [2]
  1. Pipeline Integrity Management, Burnley (United Kingdom)
  2. Servicised Ltd., Slough (United Kingdom)
Conducting a massive selective coating refurbishment program on 373 mi of a live, high-pressure natural gas pipe lines in South Australia required extensive planning and organization. The selective refurbishment project was initiated after significant coating failure was identified and five pipe line failures due to stress corrosion cracking had occurred. Problems were somewhat exacerbated by pipe lines being buried in some of the most corrosive soils in existence. Since few of the lines had been looped, it was decided to repair the lines, where possible, live and operating at normal 1,250 psi. Only concession was shut down of lines with a SCC history. The project was considered the largest of its kind in the southern hemisphere, requiring six years to complete. Part 1 of the series included an introduction of the problem and an in-depth discussion of the organization and administration of the refurbishment contract. Part 2 is a discussion on the techniques used to refurbish the gas lines, including site clearing and grading, trench excavation, existing coating removal, coating repair and backfill.
OSTI ID:
7066518
Journal Information:
Pipe Line Industry; (United States), Journal Name: Pipe Line Industry; (United States) Vol. 77:3; ISSN 0032-0145; ISSN PLINAH
Country of Publication:
United States
Language:
English

Similar Records

Large, live line rehab project requires detailed planning
Journal Article · Thu Mar 31 23:00:00 EST 1994 · Pipe Line Industry; (United States) · OSTI ID:7047514

Large, live line rehab project requires detailed planning: Part 1. [Refurbishing in-service oil and gas pipelines]
Journal Article · Mon Jan 31 23:00:00 EST 1994 · Pipe Line Industry; (United States) · OSTI ID:5109030

Rehab projects use current stripping and coating procedures
Journal Article · Sun Mar 10 23:00:00 EST 1991 · Oil and Gas Journal; (USA) · OSTI ID:5805668