BWR pilot plant life extension study at the Monticello plant: Interim Phase 2
Technical Report
·
OSTI ID:7065537
The Monticello BWR Pilot Plant Life Extension Program was initiated in 1985 to examine in some detail the technical and economic viability of life extension for an operating nuclear power plant. The scope of the Phase 1 study was the identification, importance ranking and life assessment of the critical plant components. Results of this initial phase were reported in EPRI Report NP-5181 and provided the basic encouragement to embark on a generic effort and formulation of the Nuclear Utility Plant Life Extension Program (NUPLEX). The Phase 1 conclusions, based on the initial 27 critical component assessments, contained a number of qualifiers and assumptions with respect to the remaining plant components. To verify the earlier assumptions and to expand the technical bases for a planned future license renewal process, the scope of the Phase 2 program was chosen to include evaluation of essentially all remaining plant components and structures and to supplement the technical assessments with in-plant inspections and component condition assessments. In the course of the Phase 2 assessments, the maintenance aspect of life extension was evaluated and a comprehensive listing was developed of anticipated or recommended life extension activities. Even though the evaluations were limited to the Monticello unique components and operating history, the plant is substantially generic and representative of many other operating BWR's, such that a significant value can be derived in the planning phase for other similar plants wishing to commence with longer term preparation for license renewal. 2 refs., 15 figs., 36 tabs.
- Research Organization:
- Electric Power Research Inst., Palo Alto, CA (USA); Northern States Power Co., Minneapolis, MN (USA)
- OSTI ID:
- 7065537
- Report Number(s):
- EPRI-NP-5836M; ON: TI89002431
- Country of Publication:
- United States
- Language:
- English
Similar Records
BWR Pilot Plant life extension study at the Monticello Plant, Phase 2
BWR pilot plant life extension study at the Monticello Plant: Phase 1: Final report
Status of the Monticello nuclear generating plant lead plant license renewal program
Technical Report
·
Fri Sep 01 00:00:00 EDT 1989
·
OSTI ID:5688026
BWR pilot plant life extension study at the Monticello Plant: Phase 1: Final report
Technical Report
·
Fri May 01 00:00:00 EDT 1987
·
OSTI ID:6543928
Status of the Monticello nuclear generating plant lead plant license renewal program
Conference
·
Tue Dec 31 23:00:00 EST 1991
· Transactions of the American Nuclear Society; (United States)
·
OSTI ID:7231661
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210100* -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
AGING
BWR TYPE REACTORS
CABLES
CHEMICAL REACTIONS
CONDUCTOR DEVICES
CONTAINMENT
CONTROL EQUIPMENT
CORROSION
DATA PROCESSING
ELECTRIC CABLES
ELECTRICAL EQUIPMENT
ENRICHED URANIUM REACTORS
EQUIPMENT
FLOW REGULATORS
LICENSING
MAINTENANCE
MONTICELLO REACTOR
PIPES
POWER REACTORS
PROCESSING
PUMPS
RADIATION EFFECTS
REACTOR COMPONENTS
REACTOR LICENSING
REACTORS
RECOMMENDATIONS
SERVICE LIFE
TASK SCHEDULING
VALVES
WATER COOLED REACTORS
WATER MODERATED REACTORS
210100* -- Power Reactors
Nonbreeding
Light-Water Moderated
Boiling Water Cooled
AGING
BWR TYPE REACTORS
CABLES
CHEMICAL REACTIONS
CONDUCTOR DEVICES
CONTAINMENT
CONTROL EQUIPMENT
CORROSION
DATA PROCESSING
ELECTRIC CABLES
ELECTRICAL EQUIPMENT
ENRICHED URANIUM REACTORS
EQUIPMENT
FLOW REGULATORS
LICENSING
MAINTENANCE
MONTICELLO REACTOR
PIPES
POWER REACTORS
PROCESSING
PUMPS
RADIATION EFFECTS
REACTOR COMPONENTS
REACTOR LICENSING
REACTORS
RECOMMENDATIONS
SERVICE LIFE
TASK SCHEDULING
VALVES
WATER COOLED REACTORS
WATER MODERATED REACTORS