Capital and operating cost estimates. Volume I. Preliminary design and assessment of a 12,500 BPD coal-to-methanol-to-gasoline plant. [Grace C-M-G Plant, Henderson County, Kentucky]
This Deliverable No. 18b - Capital and Operating Cost Estimates includes a detailed presentation of the 12,500 BPD coal-to-methanol-to-gasoline plant from the standpoint of capital, preoperations, start-up and operations cost estimation. The base capital cost estimate in June 1982 dollars was prepared by the Ralph M. Parsons Company under the direction of Grace. The escalated capital cost estimate as well as separate estimates for preoperations, startup and operations activities were developed by Grace. The deliverable consists of four volumes. Volume I contains details of methodology used in developing the capital cost estimate, summary information on a base June 1982 capital cost, details of the escalated capital cost estimate and separate sections devoted to preoperations, start-up, and operations cost. The base estimate is supported by detailed information in Volumes II, III and IV. The degree of detail for some units was constrained due to proprietary data. Attempts have been made to exhibit the estimating methodology by including data on individual equipment pricing. Proprietary details are available for inspection upon execution of nondisclosure and/or secrecy agreements with the licensors to whom the data is proprietary. Details of factoring certain pieces of equipment and/or entire modules or units from the 50,000 BPD capital estimate are also included. In the case of the escalated capital estimate, Grace has chosen to include a sensitivity analysis which allows for ready assessment of impacts of escalation rates (inflation), contingency allowances and the construction interest financing rates on the escalated capital cost. Each of the estimates associated with bringing the plant to commercial production rates has as a basis the schedule and engineering documentation found in Deliverable No. 14b - Process Engineering and Mechanical Design Report, No. 28b - Staffing Plans, No. 31b - Construction Plan, and No. 33b - Startup and Operation Plan.
- Research Organization:
- Grace (W.R.) and Co., Memphis, TN (USA); Parsons (Ralph M.) Co., Pasadena, CA (USA)
- DOE Contract Number:
- FC02-80ET14759
- OSTI ID:
- 7049318
- Report Number(s):
- DOE/ET/14759-T3-Vol.1-18B; ON: DE83000853
- Resource Relation:
- Other Information: Portions of document are illegible
- Country of Publication:
- United States
- Language:
- English
Similar Records
Site confirmation report. Preliminary design and assessment of a 12,500 BPD coal-to-methanol-to-gasoline plant. [Grace C-M-G Plant, Henderson County, Kentucky]
Technical support report. Preliminary design and assessment of a 12,500-BPD coal-to-methanol-to-gasoline plant. [Grace C-M-G plant; Henderson County, Kentucky; subcontractor support and proprietary equipment]
Related Subjects
01 COAL, LIGNITE, AND PEAT
GASOLINE PLANTS
CAPITAL
DESIGN
OPERATING COST
COAL GASIFICATION PLANTS
ENGINEERING
FLOWSHEETS
MAINTENANCE
NUMERICAL DATA
START-UP
CHEMICAL PLANTS
COST
DATA
DIAGRAMS
INDUSTRIAL PLANTS
INFORMATION
090121* - Hydrocarbon Fuels- Chemical Synthesis- (1976-1989)
090221 - Alcohol Fuels- Chemical Synthesis- (1976-1989)
010404 - Coal
Lignite
& Peat- Gasification