Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Uranium studies in the Tims Branch and Steed Pond system

Technical Report ·
OSTI ID:7045468
During the weekend of September 2--3, 1984, a part of the wooden spillway for Steed Pond gave way and the pond slowly drained. Consideration is being given to leaving Steed Pond dry. Steed Pond has accumulated some of the uranium discharged from 300 Area operations and past surveys have shown that the uranium concentration in the sediments ranges between 20 and 531 pCi/gm. The recently completed aerial survey of the exposed area of Steed Pond showed that the uranium was widely spread in the sediments of Steed Pond. Until ground cover is established over the exposed pond sediments, they will be subject to erosion. As much as 90 tons of sediment could be eroded from the exposed sediments in Steed Pond the first year, but the erosion could be reduced to 5--15 tons by establishing a ground cover such as rye grass. Only about 40% of the eroded sediment would be delivered to Upper Three Runs Creek, because most of the eroded sediment deposited before it reaches Upper Three Runs Creek. Less than 20 mCi of uranium would be transported downstream the first year from erosion of Steed Pond sediments, and this could be reduced to 2-- 5 mCi/year if ground cover is established.
Research Organization:
Westinghouse Savannah River Co., Aiken, SC (United States)
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC09-76SR00001; AC09-89SR18035
OSTI ID:
7045468
Report Number(s):
DPST-84-847; ON: DE92016895
Country of Publication:
United States
Language:
English