Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

CO/sub 2/ pipeline design detailed

Journal Article · · Oil Gas J.; (United States)
OSTI ID:7039343
Exploration for natural gas in the Sheep Mt. area, located ca 28 miles northwest of Walsenburg, Colo., began in early 1972. The first 2 wells completed produced CO/sub 2/ instead of natural gas. The boundaries of the Sheep Mt. unit were finalized in 1981, and the unit now consists of ca 9000 acres. The company began making studies and plans on how to produce and deliver the CO/sub 2/ to varous oil fields to be used for enhanced oil recovery (EOR) of the oil remaining in place. Since CO/sub 2/ can be transported by different methods, the company had to select the most economical method for delivery of the CO/sub 2/ to the oil fields selected for EOR. Based on the volumes needed for EOR and the production capabilities within the unit, the company decided to use a pipeline for the transportation of the 330 mmscfd that would be produced within the unit.
OSTI ID:
7039343
Journal Information:
Oil Gas J.; (United States), Journal Name: Oil Gas J.; (United States) Vol. 80:17; ISSN OIGJA
Country of Publication:
United States
Language:
English

Similar Records

ARCO builds major carbon dioxide line
Journal Article · Tue Nov 30 23:00:00 EST 1982 · Pipeline Underground Util. Constr.; () · OSTI ID:5930006

CO/sub 2//EOR: from source to resource
Journal Article · Mon Aug 01 00:00:00 EDT 1983 · Oil Gas J.; (United States) · OSTI ID:5291822

Sheep mountain CO/sub 2/ line fills out West Texas EOR grid
Journal Article · Mon May 19 00:00:00 EDT 1986 · Oil Gas J.; (United States) · OSTI ID:5719413