Aspects of remote maintenance in an FRG reprocessing plant from the manufacturer's viewpoint

Conference · · Trans. Am. Nucl. Soc.; (United States)
OSTI ID:7000730

In April 1986 a consortium led by Kraftwerk Union AG was commissioned by the German society for nuclear fuel reprocessing (DWK) to build the first West German commercial reprocessing plant for spent fuel assemblies. The main result of the planning efforts regarding remote maintenance operations inside the main process building was the introduction of FEMO technology (FEMO is an acronym based on German for remote handling modular technique). According to this technology the two cells in which the actual reprocessing (which is based on the PUREX technique) takes place are provided with frames to accommodate the process components (tanks, pumps, agitators, etc.), each frame together with the components which it supports forming one module. The two cells are inaccessible and windowless. For handling operations each cell is equipped with an overhead crane and a crane-like manipulator carrier system (MTS) with power manipulator. Viewing of the operations from outside the cells is made possible by television (TV) cameras installed at the crane, the MTS, and the manipulator. This paper addresses some examples of problems that still need to be solved in connection with FEMO handling. In particular, the need for close cooperation between the equipment operator, the component designer, the process engineer, the planning engineer, and the licensing authorities will be demonstrated.

Research Organization:
Kraftwerk Union, Offenbach, West Germany
OSTI ID:
7000730
Report Number(s):
CONF-861102-
Journal Information:
Trans. Am. Nucl. Soc.; (United States), Journal Name: Trans. Am. Nucl. Soc.; (United States) Vol. 53; ISSN TANSA
Country of Publication:
United States
Language:
English