Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

H-Coal Pilot Plant. Volume III. 4. 0 - equipment performance: 4. 1 - test program, 4. 2 - slurry pumps, 4. 3 - H-Coal reactor, 4. 4 - heaters. Final report

Technical Report ·
OSTI ID:6997462
Volume III of the H-Coal Pilot Plant Final Report is the first of four volumes devoted to equipment performance. It contains an introduction to this rather large section of the report along with a description, definition of objectives and the overall results of the Equipment Test Program. In addition, this volume contains the physical description, performance, modifications made, inspection data and commercial design and procurement recommendations for the following categories of equipment: 4.2 - Slurry Pumps, 4.3 - H-Coal reactor, and 4.4 - Heaters. The remaining categories of major Pilot Plant equipment are discussed in Volumes IV, V and VI.
Research Organization:
Ashland Synthetic Fuels, Inc., KY (USA)
DOE Contract Number:
AC05-76ET10143
OSTI ID:
6997462
Report Number(s):
DOE/ET/10143-T37-Vol.3; ON: DE84010837
Country of Publication:
United States
Language:
English