White Oak Creek Embayment time-critical CERCLA removal action sediment-retention structure

Technical Report ·
DOI:https://doi.org/10.2172/6994536· OSTI ID:6994536
Over a 20-month period between September 1990 and April 1992, the Department of Energy (DOE), acting through Martin Marietta Energy Systems, Inc., managing contractor for the DOE Oak Ridge Field Office (DOE-OR), conducted a DOE-lead and DOE-funded time-critical removal action at the White Oak Creek Embayment (WOCE), pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The time-critical removal action specifically consisted of the design and construction of a sediment-retention structure across the mouth of WOCE to prevent off-site migration of sediments contaminated by cesium ([sup 137]Cs) into the Clinch River. Construction of a sediment-retention structure was completed in mid-April 1992. The purpose of this report is to meet the substantive requirements of 40 CFR 300.165 describing a complete report on the removal operation and the actions taken.'' This section of the NCP specifically addresses on-scene coordinator reports for the Environmental Protection Agency (EPA) Superfund-lead actions and includes several elements that are not applicable to this DOE-lead action. Only those sections that are pertinent and applicable are addressed in this final report.
Research Organization:
Oak Ridge National Lab., TN (United States). Environmental Restoration Div.; CDM Federal Programs Corp., Oak Ridge, TN (United States)
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-84OR21400
OSTI ID:
6994536
Report Number(s):
ORNL/ER/Sub-91-KA931/4; ON: DE93001420