Well completion report - Sawyer No. 1 (PD-3) well, Palo Duro Basin, Texas: unanalyzed data

Technical Report ·
OSTI ID:6993343
The drilling and testing of Sawyer No. 1 well, located in Southeastern Donley County about 5 miles north of Clarendon, Texas, are described. Drilling and testing were performed by Stone and Webster Engineering Corporation as a part of a nationwide program to identify potential locations for a nuclear waste repository. This report describes the drilling and testing activities actually performed (compared to the Field Test Plan), describes the problems encountered, and provides recommendations for future work. Data gathered during drilling and testing of the well are included as appendices to this report. Drilling of the well began June 23, 1981. Casing was installed and cemented to a total depth of 5180 feet on October 14, 1981. These data are preliminary. They have been neither analyzed nor evaluated.
Research Organization:
Stone and Webster Engineering Corp., Boston, MA (USA)
DOE Contract Number:
AC06-76RL01830; AC02-83CH10140
OSTI ID:
6993343
Report Number(s):
BMI/SRP-5006; ON: DE84012672
Country of Publication:
United States
Language:
English