Rock mass and shaft concrete lining temperature measurement procedure: Final draft

Technical Report ·
OSTI ID:6972591
This procedure document describes the equipment and procedures which will be used to obtain temperature data from within rock-mass and shaft linings at the Deaf Smith Exploratory Shaft Facility. Temperature measurement methods for instrument temperature correction, fluid temperature correction, heated surface monitoring and air temperature monitoring are outside the scope of this procedure, and are covered in the appropriate individual test procedures. Calibration, acceptance testing and the assignment of transducer reference numbers are outside the scope of this procedure. Section 2.0 provides a summary of the temperature measurement methods which will be employed, together with the measurement locations, environmental considerations and measurement requirements. Test layouts, including detailed descriptions of instruments, support requirements and detailed installation procedures are also presented. Section 3.0 describes the requirements for data recording, ADAS monitoring, and data reporting. Section 4.0 defines personnel responsibilities and qualifications. In addition a measurement and installation schedule is provided, and safety and contingency plans are described. Section 5.0 discusses management and quality assurance requirements. Cited references are listed in Section 6.0. 7 refs., 9 figs.
Research Organization:
Battelle Memorial Inst., Columbus, OH (USA). Office of Nuclear Waste Isolation; Golder Associates, Inc., Redmond, WA (USA)
DOE Contract Number:
AC02-87CH10290
OSTI ID:
6972591
Report Number(s):
BMI/ONWI/C-253; ON: TI88016430
Country of Publication:
United States
Language:
English