skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Gas-lift technology applied to dewatering of coalbed methane wells in the black warrior basin

Journal Article · · SPE Production Engineering (Society of Petroleum Engineers); (United States)
DOI:https://doi.org/10.2118/21590-PA· OSTI ID:6964596
;  [1];  [2]
  1. Otis Engineering Corp., Dallas, TX (United States)
  2. Colorado School of Mines, Golden, CO (United States)

Coalbed methane (CBM) wells are usually dewatered with sucker rod or progressive cavity pumps to reduce wellbore water levels, although not without problems. This paper describes high-volume artificial-lift technology that incorporates specifically designed gas-lift methods to dewater Black Warrior CBM wells. Gas lift provides improved well maintenance and production optimization by the use of conventional wireline service methods.

OSTI ID:
6964596
Journal Information:
SPE Production Engineering (Society of Petroleum Engineers); (United States), Vol. 7:4; ISSN 0885-9221
Country of Publication:
United States
Language:
English