Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

FFTF/IEM (Fast Flux Test Facility/Interim Examination and Maintenance) Cell fuel pin removal equipment

Conference ·
OSTI ID:6961671

Disassembly of irradiated fuel assemblies at the Fast Flux Test Facility (FFTF) Interim Examination and Maintenance (IEM) Cell involves removing fuel pins from the pin bundle by sliding the pins from parallel attachment rails after the outer fuel assembly duct has been removed. Special equipment has been developed for the remote removal of fuel pins that significantly reduces pin removal time and provides better control than the previous method of direct removal with a masterslave manipulator (MSM). Remote installation and adaptability to various fuel assembly configurations in the design of this equipment. 7 figs.

Research Organization:
Westinghouse Hanford Co., Richland, WA (USA)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
6961671
Report Number(s):
WHC-SA-0092; CONF-8711195-2; ON: DE88013586
Country of Publication:
United States
Language:
English