Well completion report - dissolution zone water wells (PD-8, PD-11, PD-12, PD-13), Palo Duro Basin, Texas: unanalyzed data
Technical Report
·
OSTI ID:6952687
This report describes the drilling and testing of four dissolution zone water wells: Sawyer No. 2, Mansfield No. 2, Detten No. 2, and Harman No. 1; each in a different location in Texas. Drilling and testing were performed by Stone and Webster Engineering Corporation as a part of a nationwide program to identify potential locations for a nuclear waste repository. Stone and Webster worked under a contract with the US Department of Energy's Program Manager: Battelle Project Management Division, Office of Nuclear Waste Isolation. This report describes the drilling and testing activities actually performed (compared to the Field Test Plan), describes the problems encountered, and provides recommendations for future work. Data gathered during drilling and testing of the well are included as appendices to this report. These data are preliminary. They have been neither analyzed nor evaluated. 5 figures.
- Research Organization:
- Stone and Webster Engineering Corp., Boston, MA (USA)
- DOE Contract Number:
- AC02-83CH10140; AC06-76RL01830
- OSTI ID:
- 6952687
- Report Number(s):
- BMI/SRP-5002; ON: DE84011685
- Country of Publication:
- United States
- Language:
- English
Similar Records
Well completion report - Harman No. 1 (PD-8) well, Palo Duro Basin, Texas: unanalyzed data
Well completion report - Detten No. 1 (PD-6) well, Palo Duro Basin, Texas: unanalyzed data
Well completion report - Mansfield No. 1 (PD-4) well, Palo Duro Basin, Texas: unanalyzed data
Technical Report
·
Tue May 01 00:00:00 EDT 1984
·
OSTI ID:7148349
Well completion report - Detten No. 1 (PD-6) well, Palo Duro Basin, Texas: unanalyzed data
Technical Report
·
Tue May 01 00:00:00 EDT 1984
·
OSTI ID:6993342
Well completion report - Mansfield No. 1 (PD-4) well, Palo Duro Basin, Texas: unanalyzed data
Technical Report
·
Tue May 01 00:00:00 EDT 1984
·
OSTI ID:6839630
Related Subjects
052002* -- Nuclear Fuels-- Waste Disposal & Storage
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
DRILLING
FEDERAL REGION VI
GEOLOGIC DEPOSITS
GROUND WATER
HIGH-LEVEL RADIOACTIVE WASTES
HYDROGEN COMPOUNDS
HYDROLOGY
MANAGEMENT
MATERIALS
NORTH AMERICA
OXYGEN COMPOUNDS
PALO DURO BASIN
PERMIAN BASIN
RADIOACTIVE MATERIALS
RADIOACTIVE WASTE DISPOSAL
RADIOACTIVE WASTES
SALT DEPOSITS
SAMPLING
SITE SELECTION
TEXAS
UNDERGROUND DISPOSAL
USA
WASTE DISPOSAL
WASTE MANAGEMENT
WASTES
WATER
WELL COMPLETION
WELL DRILLING
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE WASTES FROM NUCLEAR FACILITIES
DRILLING
FEDERAL REGION VI
GEOLOGIC DEPOSITS
GROUND WATER
HIGH-LEVEL RADIOACTIVE WASTES
HYDROGEN COMPOUNDS
HYDROLOGY
MANAGEMENT
MATERIALS
NORTH AMERICA
OXYGEN COMPOUNDS
PALO DURO BASIN
PERMIAN BASIN
RADIOACTIVE MATERIALS
RADIOACTIVE WASTE DISPOSAL
RADIOACTIVE WASTES
SALT DEPOSITS
SAMPLING
SITE SELECTION
TEXAS
UNDERGROUND DISPOSAL
USA
WASTE DISPOSAL
WASTE MANAGEMENT
WASTES
WATER
WELL COMPLETION
WELL DRILLING