Comparison of implementation of selected TMI action plan requirements on operating plants designed by Babcock and Wilcox
This report provides the results of a study conducted by the US Nuclear Regulatory Commission staff to compare the degree to which eight Babcock and Wilcox (B and W) designed licensed nuclear power plants have complied with the requirements in NUREG-0737, Clarification of TMI Action Plan Requirements. The eight licensed operating plants examined are as follows: Arkansas Nuclear One Unit 1 (ANO-1), Crystal River Unit 3, Davis Besse, Oconee Units 1, 2, and 3, Rancho Seco, and Three Mile Island Unit 1 (TMI-1). The purpose of this audit was to establish the progress of the TMI-1 licensee, General Public Utilities (GPU) Nuclear Corporation, in completing the long-term requirements in NUREG-0737 relative to the other B and W licensees examined.
- Research Organization:
- Nuclear Regulatory Commission, Washington, DC (USA). Office of Nuclear Reactor Regulation
- OSTI ID:
- 6948577
- Report Number(s):
- NUREG-1066; ON: DE84901248
- Country of Publication:
- United States
- Language:
- English
Similar Records
Inspection guidance for the Rancho Seco plant derived from generic PRA information
RETRAN-02 comparison of natural circulation flow rates at Babcock and Wilcox 177-FA plants
Related Subjects
210200 -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
210700* -- Nuclear Power Plants-- Regulation & Licensing
ARKANSAS-1 REACTOR
AUXILIARY SYSTEMS
AUXILIARY WATER SYSTEMS
CONTROL ROOMS
CRYSTAL RIVER-3 REACTOR
DAVIS BESSE-1 REACTOR
EMERGENCY PLANS
ENGINEERING
ENRICHED URANIUM REACTORS
HUMAN FACTORS ENGINEERING
LICENSING
MODIFICATIONS
OCONEE-1 REACTOR
OCONEE-2 REACTOR
OCONEE-3 REACTOR
POWER REACTORS
PWR TYPE REACTORS
RANCHO SECO-1 REACTOR
REACTOR INSTRUMENTATION
REACTOR LICENSING
REACTORS
SHIELDING
THERMAL REACTORS
THREE MILE ISLAND-1 REACTOR
WATER COOLED REACTORS
WATER MODERATED REACTORS