Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

/sup 238/Pu fuel form processes. Bimonthly report, November-December 1979

Technical Report ·
DOI:https://doi.org/10.2172/6947337· OSTI ID:6947337
Progress in the Savannah River Laboratory's /sup 238/Pu Fuel Form Program is summarized. Full-scale fabrication tests continued in the Plutonium Experimental Facility (PEF) with the successful fabrication of seven additional GPHS pellets. Three pellets (GPHS Pellets 14, 15, and 16) were fabricated at off-centerline conditions to help define process limits for production of GPHS fuel pellets in the Plutonium Fuel Fabrication (PuFF) Facility. Two additional limit-test pellets (GPHS Pellets 12 and 13) previously hot pressed underwent final heat treatment. Two pellets (GPHS Pellets 17 and 18) were fabricated at centerline conditions as part of the effort to have Savannah River Laboratory (SRL) GPHS pellets impact tested at LASL. All seven pellets remained integral and demonstrated excellent dimensional stability during final heat treatment. However, the quality of those pellets fabricated at centerline conditions was superior to those that were fabricated as part of the limit tests.
Research Organization:
Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.
DOE Contract Number:
AC09-76SR00001
OSTI ID:
6947337
Report Number(s):
DPST-79-128-11/12
Country of Publication:
United States
Language:
English