Preplanning guidance document for groundwater restoration. [Uranium Mill Tailings Remedial Action (UMTRA) Project]

Technical Report ·
OSTI ID:6934355

This document is intended to present decision makers on the Uranium Mill Tailings Remedial Action (UMTRA) Project with a strategy for evaluating the need for and accomplishing groundwater restoration at those UMTRA Project sites that will require restoration as specified in Subpart B of 40 CFR 192. A synopsis of the Uranium Mill Tailings Restoration Control Act (UMTRCA) and a discussion of the proposed US Environmental Protection Agency (EPA) groundwater cleanup standards in 40 CFR 192 are provided to define the regulatory basis of groundwater cleanup. Once the EPA groundwater standards are finalized, this document may be revised, depending on the changes in the final standards. A procedure for determining the need for groundwater restoration is outlined and a cost-effective strategy for selecting, designing, implementing, and evaluating appropriate restoration procedures is presented. The determination of the need for groundwater restoration is based on the EPA groundwater cleanup standards and must be compatible with and complementary to the National Environmental Policy Act (NEPA) process. Therefore, this document describes a programmatic approach for compliance with the NEPA process.

Research Organization:
USDOE Albuquerque Field Office, NM (United States). Uranium Mill Tailings Remedial Action Project Office
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC04-91AL62350
OSTI ID:
6934355
Report Number(s):
DOE/UMTRA-400670-0000; ON: DE93009140
Country of Publication:
United States
Language:
English