skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Foamed cement for squeeze cementing low-pressure, highly permeable reservoirs; Design and evaluation

Journal Article · · SPE Drilling Engineering (Society of Petroleum Engineers); (United States)
DOI:https://doi.org/10.2118/20425-PA· OSTI ID:6929370
 [1];  [2]
  1. Dowell Schlumberger, Inc., Fort Worth, TX (United States)
  2. Husky Oil Operations, Ltd. (United States)

Four different cement squeezing techniques have been used on wells producing from the Keg River formation in the Rainbow Lake area of Alberta, Canada. This paper evaluates 151 cement squeeze treatments performed at 96 wellsites and compares the use of foam cement vs. conventional squeeze treatments and techniques. Discussion includes key aspects, such as candidate selection, slurry design, treatment design, economic evaluation, and operational considerations.

OSTI ID:
6929370
Journal Information:
SPE Drilling Engineering (Society of Petroleum Engineers); (United States), Vol. 7:4, Issue 04; ISSN 0885-9744
Country of Publication:
United States
Language:
English

Similar Records

Rainbow project may hit 96% recovery
Journal Article · Mon Dec 16 00:00:00 EST 1968 · Oil Gas J.; (United States) · OSTI ID:6929370

Proven squeeze cementing technique in a dolomite reservoir
Conference · Wed Jan 01 00:00:00 EST 1969 · Soc. Pet. Eng. AIME, Pap.; (United States) · OSTI ID:6929370

A complex reservoir characterized by three-dimensional seismic, geostatistical reservoir description, and sponge-core analysis
Journal Article · Fri Sep 01 00:00:00 EDT 1989 · SPE (Society of Petroleum Engineers) Formation Evaluation; (USA) · OSTI ID:6929370