Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Maintenance Implementation Plan for the Fast Flux Test Facility

Technical Report ·
OSTI ID:6926545
The maintenance program for the 400 Area, Fast Flux Test Facility (FFTF)Plant and plant support facilities includes the reactor plant, reactor support systems and equipment, Maintenance and Storage Facility, plant buildings, and building support systems. These are the areas of the facility that are covered by this plan. The personnel support facilities and buildings are maintained and supported by another department within Westinghouse Hanford, and are not included here. The FFTF maintenance program conducts the corrective and preventive maintenance necessary to ensure the operational reliability and safety of the reactor plant and support equipment. This comprehensive maintenance program also provides for maximizing the useful life of plant equipment and systems to realize the most efficient possible use of resources. The long-term future of the FFTF is uncertain; in the near term, the facility is being placed in standby. As the plant transitions from operating status to standby, the scope of the maintenance program will change from one of reactor operational reliability and life extension to preservation.
Research Organization:
Westinghouse Hanford Co., Richland, WA (United States)
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-87RL10930
OSTI ID:
6926545
Report Number(s):
WHC-SP-0839; ON: DE93001751
Country of Publication:
United States
Language:
English