Information management needs for Fort Calhoun's design basis reconstitution project
Conference
·
· Transactions of the American Nuclear Society; (USA)
OSTI ID:6923609
While the need for information management is not new to the nuclear industry or Omaha Public Power District (OPPD), the interrelationship among design information, multiple systems, and design basis issues has necessitated the management of this information in new ways. The project team involved in the reconstitution of the design basis for OPPD's Fort Calhoun nuclear station has experienced the need for the developed effective methods for managing the vast amount of interrelated information associated with this effort. This management of information has been necessary to ensure that design basis documents (DBDs) adequately reflect the interrelated nature of component, system, and plant design; are complete and accurate; and are produced and maintained in a cost-effective manner. Fort Calhoun's aggressive design basis reconstitution project began in early 1987. The present scope of the project includes the production of 52 system and plant level DBDs; currently the project is {approximately}50% complete with DBDs in various stages of completion, from pilot DBDs through DBDs with approved formats, which have been issued for use. The experience in producing these documents has lead to a growing understanding of the special need for information management in each stage of the project. The development of the information tracking and management processes for the various stages of DBD development has proven to be cost-effective and gives a level of assurance that information has been included in the DBDs consistently and accurately.
- OSTI ID:
- 6923609
- Report Number(s):
- CONF-890604--
- Conference Information:
- Journal Name: Transactions of the American Nuclear Society; (USA) Journal Volume: 59
- Country of Publication:
- United States
- Language:
- English
Similar Records
Benefits of design-basis reconstitution in preparing 10CFR50. 59 reviews
Configuration management after design basis reconstitution
In-plant source term measurements at Fort Calhoun Station, Unit 1
Conference
·
Thu Dec 31 23:00:00 EST 1987
· Trans. Am. Nucl. Soc.; (United States)
·
OSTI ID:6170231
Configuration management after design basis reconstitution
Conference
·
Mon Dec 31 23:00:00 EST 1990
· Transactions of the American Nuclear Society; (United States)
·
OSTI ID:5981995
In-plant source term measurements at Fort Calhoun Station, Unit 1
Technical Report
·
Fri Mar 31 23:00:00 EST 1978
·
OSTI ID:6798230
Related Subjects
21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS
210200* -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
ACCURACY
CALHOUN-1 REACTOR
CALHOUN-2 REACTOR
DESIGN
DOCUMENTATION
ECONOMICS
EFFICIENCY
ENRICHED URANIUM REACTORS
ERRORS
INFORMATION RETRIEVAL
INFORMATION VALIDATION
MANAGEMENT
POWER REACTORS
PROGRAM MANAGEMENT
PWR TYPE REACTORS
QUALITY ASSURANCE
REACTORS
TESTING
THERMAL REACTORS
VALIDATION
WATER COOLED REACTORS
WATER MODERATED REACTORS
210200* -- Power Reactors
Nonbreeding
Light-Water Moderated
Nonboiling Water Cooled
ACCURACY
CALHOUN-1 REACTOR
CALHOUN-2 REACTOR
DESIGN
DOCUMENTATION
ECONOMICS
EFFICIENCY
ENRICHED URANIUM REACTORS
ERRORS
INFORMATION RETRIEVAL
INFORMATION VALIDATION
MANAGEMENT
POWER REACTORS
PROGRAM MANAGEMENT
PWR TYPE REACTORS
QUALITY ASSURANCE
REACTORS
TESTING
THERMAL REACTORS
VALIDATION
WATER COOLED REACTORS
WATER MODERATED REACTORS