Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Technical procedures for ecology: Environmental field program, Deaf Smith County Site, Texas: Final draft

Technical Report ·
OSTI ID:6915277

This volume contains Technical Procedures pursuant to the Land Use Site Study Plan including walkover surveys for threatened, endangered, or candidate species; vegetation classification and mapping; reclamation planning; wetland and floodplain determination and characterization of playas; wildlife habitat mapping methods; mammal sampling; bird survey methods; reptile and amphibian survey methods; preexisting environmental; stress and disturbance studies methods; voucher specimens for plants; and voucher specimens to wildlife. 9 refs., 5 figs., 1 tab.

Research Organization:
Battelle Memorial Inst., Columbus, OH (USA). Office of Nuclear Waste Isolation; Morrison-Knudsen Engineers, Inc., Denver, CO (USA)
DOE Contract Number:
AC02-87CH10290; AC02-83CH10140
OSTI ID:
6915277
Report Number(s):
BMI/ONWI/C-86; ON: TI88012842
Country of Publication:
United States
Language:
English