Supplemental spares plan: heliostat field subsystem for 10 megawatt solar power systems/central receiver system
Technical Report
·
OSTI ID:6906872
All components/parts of the heliostat system were designed and selected for long life. Only a few electrical items and the mirror module doublers had to be replaced/repaired during installation, test, and final checkout. After all initial failures are identified and corrected, daily routine operation should be relatively trouble-free. The 93 heliostats installed in Spain have been operational for four months, with only four electrical failures. Table I gives a listing of all components used, spares provided, additional spares recommended, estimated lead time, and source. Table II gives a listing of manufacturer/supplier addresses for each component.
- Research Organization:
- Martin Marietta Corp., Denver, CO (USA). Denver Div.
- DOE Contract Number:
- AC03-80SF10539
- OSTI ID:
- 6906872
- Report Number(s):
- DOE/SF/10539-11; STMPO-298; MCR-81-1770; ON: DE84011433
- Country of Publication:
- United States
- Language:
- English
Similar Records
Maintenance instructions: heliostat field subsystem for 10 megawatt solar power system/central receiver system
Operations instructions heliostat field subsystem for 10 megawatt solar power systems/central receiver system
Heliostat Stimulator operator's manual
Technical Report
·
Sat Aug 01 00:00:00 EDT 1981
·
OSTI ID:6951121
Operations instructions heliostat field subsystem for 10 megawatt solar power systems/central receiver system
Technical Report
·
Thu Oct 01 00:00:00 EDT 1981
·
OSTI ID:6991002
Heliostat Stimulator operator's manual
Technical Report
·
Fri Oct 31 23:00:00 EST 1980
·
OSTI ID:6838698