Comparison of muon flux measurements to Halo Monte Carlo predictions
Experiment E-782 has been approved to run during the next fixed target cycle in a fast-spill muon beam aimed at the Tohoku bubble chamber, located in Lab F. New construction is necessary to provide this beam. Initial feasibility tests were carried out during the last fixed target run, measuring both muon fluxes and background halo rates, as a function of several parameters. These test results are compared in detail with the predictions of the Monte Carlo program HALO, and can be used as a benchmark for design of the final beamline. 3 refs., 16 figs.
- Research Organization:
- Fermi National Accelerator Lab., Batavia, IL (USA)
- DOE Contract Number:
- AC02-76CH03000
- OSTI ID:
- 6894138
- Report Number(s):
- FNAL-TM-1534; ON: DE88016748
- Country of Publication:
- United States
- Language:
- English
Similar Records
A Muon Exposure in the Tohoku High Resolution Bubble Chamber
Method to rapidly tune the halo spoilers of the tevatron muon beam
Muon fluence measurements at 800 GeV
Technical Report
·
Tue Dec 31 23:00:00 EST 1985
·
OSTI ID:992265
Method to rapidly tune the halo spoilers of the tevatron muon beam
Technical Report
·
Mon Sep 01 00:00:00 EDT 1986
·
OSTI ID:5104684
Muon fluence measurements at 800 GeV
Technical Report
·
Wed Oct 31 23:00:00 EST 1984
·
OSTI ID:6050744