skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: United States Department of Energy, Strategic Petroleum Reserve: Phase 2, CERCLA (Comprehensive Environmental Response Compensation Liability Act) report: Confirmation

Technical Report ·
OSTI ID:6891726

This report was prepared on behalf of the Department of Energy (DOE) by Boeing Petroleum Services, Inc. the management, operations, and maintenance contractor to DOE for the Strategic Petroleum Reserve. DOE Order 5480.14 requires all DOE-owned sites to achieve compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In accordance with the understanding reached between BPS and DOE, and as set forth in the letter dated March 28, 1985, DOE is the owner and operator of the SPR. This report fulfills Phase II (Confirmation) of that order, which is to conduct sampling at the areas of potential hazardous waste identified in the Installation Assessment (Phase I) to confirm the presence or absence of hazardous waste. Recommendations to proceed to the Engineering Assessment (Phase III) are made for areas where the presence of hazardous waste is confirmed. In Phase I, recommendations for further sampling were made for the Bayou Choctaw, Big Hill, Bryan Mound, and Sulphur Mines sites. This sampling was carried out as Phase II. Findings from that sampling are presented in this report. Recommendations to proceed to Engineering Assessment were made for Bayous Choctaw cavern 10 and for the Big Hill wells. 11 figs., 39 tabs.

Research Organization:
Boeing Petroleum Services, Inc., Harahan, LA (USA)
DOE Contract Number:
AC96-85PO21431
OSTI ID:
6891726
Report Number(s):
DOE/PO/21431-T4; ON: DE87009335
Resource Relation:
Other Information: Portions of this document are illegible in microfiche products
Country of Publication:
United States
Language:
English