10 MWe solar thermal central receiver pilot plant operational testing plan
This document delineates the plan for operational testing of the 10 MWe Solar Thermal Central Receiver Pilot Plant at Barstow, CA. During an initial two-year experimental period, a wide variety of tests will be conducted to accumulate data on performance of the plant and its subsystems and components. By the end of this period it is expected that a reasonably complete engineering evaluation of the plant will have been completed. In addition, plant operating modes and control configurations will have been optimized for various combinations of clear and cloudy scenarios. Based upon this knowledge, the test program can then proceed to a follow-on three-year power production period to demonstrate the capability of the pilot plant to supply electrical power to the SCE grid at capacity factors expected for a solar thermal plant. In addition to delineating the complete test program, this test plan includes pertinent system descriptions and provides information on test management, test schedules, measurement requirements, data management, and technology transfer. Test specifications for individual tests involving the entire plant are given in Appendix A. Appendix B lists the requirements for component performance evaluation tests. These are tests which involve individual aspects of the overall plant (e.g., the heliostat mirrors) for which data must be obtained at repetitive intervals throughout the operational test phase. Appendix C provides information on the computations needed for in-test and post-test data reduction. Appendix D discusses test precautions and operational considerations which influenced the choice of test parameters and the sequencing selection for pilot plant testing.
- Research Organization:
- Rockwell International Corp., Canoga Park, CA (USA). Energy Technology Engineering Center
- DOE Contract Number:
- AC03-76SF00700
- OSTI ID:
- 6887979
- Report Number(s):
- DOE/SF/00700-T7; STMPO-065; ON: DE84011307
- Country of Publication:
- United States
- Language:
- English
Similar Records
The power production operation of Solar One, the 10 MWe Solar Thermal Central Receiver Pilot Plant
Data evaluation plan for the 10 MWe solar thermal central receiver pilot plant power production phase
10-MWe central-receiver solar-thermal pilot plant data-evaluation plan
Journal Article
·
Mon May 01 00:00:00 EDT 1989
· J. Sol. Energy Eng.; (United States)
·
OSTI ID:5945036
Data evaluation plan for the 10 MWe solar thermal central receiver pilot plant power production phase
Technical Report
·
Mon Oct 01 00:00:00 EDT 1984
·
OSTI ID:6283734
10-MWe central-receiver solar-thermal pilot plant data-evaluation plan
Technical Report
·
Tue Nov 30 23:00:00 EST 1982
·
OSTI ID:6590520
Related Subjects
14 SOLAR ENERGY
140702* -- Solar Thermal Power Systems-- Central Receiver
BARSTOW SOLAR PILOT PLANT
DATA ACQUISITION
DATA ANALYSIS
EVALUATION
FUNCTIONAL MODELS
OPERATION
PILOT PLANTS
PLANNING
POWER PLANTS
SOLAR POWER PLANTS
SOLAR THERMAL POWER PLANTS
TECHNOLOGY TRANSFER
TESTING
THERMAL POWER PLANTS
TOWER FOCUS POWER PLANTS
140702* -- Solar Thermal Power Systems-- Central Receiver
BARSTOW SOLAR PILOT PLANT
DATA ACQUISITION
DATA ANALYSIS
EVALUATION
FUNCTIONAL MODELS
OPERATION
PILOT PLANTS
PLANNING
POWER PLANTS
SOLAR POWER PLANTS
SOLAR THERMAL POWER PLANTS
TECHNOLOGY TRANSFER
TESTING
THERMAL POWER PLANTS
TOWER FOCUS POWER PLANTS