Site study plan for Deep Hydronest Test Wells, Deaf Smith County Site, Texas: Preliminary draft
Wells called Deep Hydronest Wells will be installed at six locations at the Deaf Smith County Site to characterize hydraulic parameters in the geologic column between the top of the San Andres Formation and the base of Pennsylvanian System. Three hydronests will be drilled during early stages of site characterization to provide data for performance assessment modeling. Four wells are proposed for each of these 3 nests. Results of drilling, testing, and preliminary modeling will direct drilling and testing activities at the last 3 nests. Two wells are proposed at each of the last 3 nests for a total of 18 wells. The Salt Repository Project (SRP) Networks specify the schedule under which this program will operate. Drilling and hydrologic testing of the first Deep Hydronest will begin early in the Surface Investigation Program. Drilling and testing of the first three Deep Hydronests will require about 18 months. After 12 months of evaluating and analyzing data from the first three hydronests, the remaining three hydronests will be drilled during a 12-month period. The Technical Field Services Contractor is responsible for conducting the field program. Samples and data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be used to assure that activities affecting quality are performed correctly and that the appropriate documentation is maintained. 36 refs., 20 figs., 6 tabs.
- Research Organization:
- Battelle Memorial Inst., Columbus, OH (USA). Office of Nuclear Waste Isolation
- DOE Contract Number:
- AC02-87CH10290
- OSTI ID:
- 6847442
- Report Number(s):
- BMI/ONWI/C-159; ON: TI88014893
- Resource Relation:
- Other Information: Portions of this document are illegible in microfiche products
- Country of Publication:
- United States
- Language:
- English
Similar Records
Site study plan for Exploratory shaft facilities design foundation boreholes (shaft surface facility foundation borings), Deaf Smith County Site, Texas: Surface-based geotechnical field program: Preliminary draft
Site study plan for borehole search and characterization, Deaf Smith County Site, Texas: Revision 1
Related Subjects
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS
HIGH-LEVEL RADIOACTIVE WASTES
UNDERGROUND DISPOSAL
COMPLIANCE
DRILL CORES
DRILLING
EVALUATION
PROGRAM MANAGEMENT
RADIOACTIVE WASTE FACILITIES
RADIOACTIVE WASTE MANAGEMENT
REGULATIONS
SALT DEPOSITS
SITE CHARACTERIZATION
SPENT FUELS
TEXAS
ENERGY SOURCES
FEDERAL REGION VI
FUELS
GEOLOGIC DEPOSITS
MANAGEMENT
MATERIALS
NORTH AMERICA
NUCLEAR FACILITIES
NUCLEAR FUELS
RADIOACTIVE MATERIALS
RADIOACTIVE WASTES
REACTOR MATERIALS
USA
WASTE DISPOSAL
WASTE MANAGEMENT
WASTES
052002* - Nuclear Fuels- Waste Disposal & Storage
053000 - Nuclear Fuels- Environmental Aspects