Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Tooele army depot - north area. Feasibility study for operable units 5, 6, 7, and 10. Final report, 1 October 1992-15 March 1994

Technical Report ·
OSTI ID:6839197
This report presents the results of the feasibility study for six sites within four operable units (OU) at Tooele Army Depot-North Area (TEAD-N). It contains a general introduction and background for TEAD-N, a description of the remedial technologies which were considered for the OUs, followed by a section specific to each OU. These sections include a description and history, a summary of the contaminants identified during the RI, the contaminant fate and transport, a summary of the risk assessment for human health and the environment, a discussion of the remedial-action objectives, the identification and screening of technologies, a discussion of the development and analysis of remedial alternatives, and a comparative analysis of the remedial alternatives considered. Location-specific and chemical-specific ARARs, cost estimate data, and correspondence related to one OU are presented in appendices. The report consists of one volume, including the FS report and three appendices. Feasibility study, Tooele Army depot-north area, Remedial action alternatives.
Research Organization:
SEC Donohue, Inc., Grand Junction, CO (United States)
OSTI ID:
6839197
Report Number(s):
AD-A-282931/5/XAB; CNN: DAAA15-90-D-0007
Country of Publication:
United States
Language:
English