Title: Effect of a 12-hour/day shift on performance

Conference ·
OSTI ID:6837657

The operating crews at the Fast Flux Facility near Richland, Washington, changed their rotating shift schedule from an 8- to 12- hour/day work schedule. The primary reason for the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. Plant performance and safety were not adversely affected. A statistical analysis of 53 operator-related, off-normal events in 28 months concluded that there was no significant difference in either the number or the severity of off-normal events on the 12-hour shift. A statistical analysis of 200,000 log entries concluded that the error rate in completing logs actually declined by 25 percent on the 12-hour shift. Alertness, which was measured using computerized tests of mathematics and logical reasoning, reach a nadir on the first night shift for the 8- and 12-hour schedules alike, which indicates that the primary cause of fatigue was sleep disruption, not cumulative hours of work. All supervisors and 52 percent of the operators believe their crews work more effectively on the 12-hour shift; only 12 percent of the operators believe that their crews work less effectively. The evaluation indicated that the 12-hour shift scheduled is a reasonable alternative to an 8-hour schedule at this facility. 2 refs.

Research Organization:
Pacific Northwest Lab., Richland, WA (USA)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
6837657
Report Number(s):
PNL-SA-15620; CONF-880633-7; ON: DE88013184; TRN: 88-031807
Resource Relation:
Conference: 4. international conference on human factors and power plants, Monterey, CA, USA, 5 Jun 1988; Other Information: Portions of this document are illegible in microfiche products
Country of Publication:
United States
Language:
English