skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Material open test assembly processing at the FFTF's IEM cell. [Interim examination and maintenance]

Conference ·
OSTI ID:6837161

The Interim Examination and Maintenance (IEM) Cell is a vertical hot cell located within the containment dome of the Fast Flux Test Facility (FFTF). The cell has two basic functions: (1) to perform disassembly/reassembly and nondestructive testing on radioactive, sodium-wetted reactor components, and (2) to provide a shielded work volume where radioactive, sodium-wetted reactor and refueling equipment can be repaired and maintained. One of the recent FFTF experiments processed through the IEM Cell was the Material Open Test Assembly (MOTA). This paper describes the disassembly and reassembly of the MOTA test assembly.

Research Organization:
Hanford Engineering Development Lab., Richland, WA (USA)
DOE Contract Number:
AC06-76FF02170
OSTI ID:
6837161
Report Number(s):
HEDL-SA-3092-S; CONF-840614-46; ON: DE84010317
Resource Relation:
Conference: Annual meeting of the American Nuclear Society, New Orleans, LA, USA, 3 Jun 1984; Other Information: Portions are illegible in microfiche products
Country of Publication:
United States
Language:
English