Design and start-up of Gary Works' pulverized coal injection facilities
Conference
·
· Iron and Steel Engineer; (United States)
OSTI ID:6835410
- Gary Works, IN (United States)
- PCI Operating Co., Gary, IN (United States)
- USX Corp., Monroeville, PA (United States)
A pulverized coal injection system began operation at the Gary works' blast furnaces on Feb. 1, 1993. This system is capable of processing more than 3500 tons of coal/day to eventually supply the furnaces at a 400 lb/NTHM rate. The start-up was aggressive with coal levels exceeding 200 lb/NTHM within two to five weeks on the furnaces. Current rates are in the 250 to 290 lb/NTHM range.
- OSTI ID:
- 6835410
- Report Number(s):
- CONF-9309280-; CODEN: IRSEA5
- Journal Information:
- Iron and Steel Engineer; (United States), Vol. 70:7; Conference: 1993 American Iron and Steel Engineers (AISE) annual convention, Pittsburgh, PA (United States), 20-23 Sep 1993; ISSN 0021-1559
- Country of Publication:
- United States
- Language:
- English
Similar Records
Gary No. 13 blast furnace achieves 400 lbs/THM coal injection in 9 months
Pellet property requirements for future blast-furnace operations and other new ironmaking processes
Blast-furnace ironmaking -- Existing capital and continued improvements are a winning formula for a bright future
Conference
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:6835410
+1 more
Pellet property requirements for future blast-furnace operations and other new ironmaking processes
Conference
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:6835410
Blast-furnace ironmaking -- Existing capital and continued improvements are a winning formula for a bright future
Book
·
Fri Dec 01 00:00:00 EST 1995
·
OSTI ID:6835410