Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

New type of drilling contract minimizes well costs by guaranteeing performance

Journal Article · · J. Pet. Technol.; (United States)
DOI:https://doi.org/10.2118/16091-PA· OSTI ID:6828989
Most current drilling contracts are either (1) daywork, where the operator assumes all risks; (2) turnkey, where the contractor assumes all risks; or (3) footage, where the operator assumes most risks and the contractor is paid on the basis of the length of hole drilled. In a new type of contract, ''shared risk,'' each party assumes the risk it is best qualified to accept. The operator assumes the risk of geology, location-dependent factors, and weather, while the contractor assumes the risk of drilling performance. The shared-risk drilling contract provides a tangible incentive for the contractor to provide better-than-average performance, while the operator is allowed to retain full control over the parameters that result in a well drilled to desired specifications at the lowest possible cost.
Research Organization:
Western Oceanic Inc. (US)
OSTI ID:
6828989
Journal Information:
J. Pet. Technol.; (United States), Journal Name: J. Pet. Technol.; (United States) Vol. 40:7; ISSN JPTJA
Country of Publication:
United States
Language:
English

Similar Records

What happened to the daywork contract
Conference · Mon Jan 31 23:00:00 EST 1983 · Soc. Pet. Eng. AIME, Pap.; (United States) · OSTI ID:5699543

The drilling contract--a reflection of market conditions
Conference · Mon Jan 31 23:00:00 EST 1983 · Soc. Pet. Eng. AIME, Pap.; (United States) · OSTI ID:5631922

IADC/SPE panel probes drilling contracts, business trends
Journal Article · Mon Sep 12 00:00:00 EDT 1983 · Oil Gas J.; (United States) · OSTI ID:6987317