Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Compliance testing of Grissom AFB central-heating-plant coal-fired boilers 3 and 4, Grissom AFB Indiana. Final report, 18-23 November 1987

Technical Report ·
OSTI ID:6815656
At the request of HQ SAC/SGPB, compliance testing (particulate emissions) of coal-fired boilers 3 and 4 in the Grissom AFB central heating plant was performed on 18-23 Nov 1987. The survey was conducted to determine compliance with Indiana Administrative Code, Title 325--Air Pollution Control Board, Articles 5 and 6. Results indicate Boiler 3 met particulate standards while exhausting through the bypass stack, but failed to meet standards when exhausting through the scrubber stack. Boiler 4 met particulate standards when exhausting through both the bypass the scrubber stacks.
Research Organization:
Air Force Occupational and Environmental Health Lab., Brooks AFB, TX (USA)
OSTI ID:
6815656
Report Number(s):
AD-A-195220/9/XAB; USAFOEHL-88-050EQ0025CEF
Country of Publication:
United States
Language:
English