Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Implementation of the DYMAC system at the new Los Alamos Plutonium Processing Facility. Phase II report

Technical Report ·
DOI:https://doi.org/10.2172/6812862· OSTI ID:6812862
The DYnamic Materials ACcountability System - called DYMAC - performs accountability functions at the new Los Alamos Plutonium Processing Facility where it began operation when the facility opened in January 1978. A demonstration program, DYMAC was designed to collect and assess inventory information for safeguards purposes. It accomplishes 75% of its design goals. DYMAC collects information about the physical inventory through deployment of nondestructive assay instrumentation and video terminals throughout the facility. The information resides in a minicomputer where it can be immediately sorted and displayed on the video terminals or produced in printed form. Although the capability now exists to assess the collected data, this portion of the program is not yet implemented. DYMAC in its present form is an excellent tool for process and quality control. The facility operator relies on it exclusively for keeping track of the inventory and for complying with accountability requirements of the US Department of Energy.
Research Organization:
Los Alamos National Lab., NM (USA)
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
6812862
Report Number(s):
LA-9418; ON: DE83000472
Country of Publication:
United States
Language:
English