Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Reactor statistics, Section III, April 1961--May 15, 1962. Reactor Simulation Study, Reactor 5

Technical Report ·
DOI:https://doi.org/10.2172/6809083· OSTI ID:6809083
The discussion and summary report presented here illustrate the type of information that is currently in data processing machine language and available to those who require it. During the progress meetings at which these reports were discussed, several persons indicated a desire to have a documented explanation of the report and a personal copy to scan. This is the answer to these requests. The reports are comprised of three major sections. The first is a map indicating the number of recordings of data in the category defined by the function number code. The second is a summary of the data, in terms of hours, for each of the functions performed during an outage, except secondary function code number 21 which is the number of tubes associated with the basic function performed. The third is a summary of the secondary functions performed within a basic function class, the associated delay total, and the number of tubes involved for those functions where a delineation by tube count may be of interest.
Research Organization:
General Electric Co., Richland, WA (United States). Hanford Atomic Products Operation
Sponsoring Organization:
DOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC06-76RL01830
OSTI ID:
6809083
Report Number(s):
HW-57168-E; ON: DE94015429
Country of Publication:
United States
Language:
English