Study of face-to-face moves for longwall equipment. Final report, Part 1
Technical Report
·
OSTI ID:6805192
This report documents a study with the objective to design and develop methods and techniques to reduce longwall equipment move time by 30 percent. A literature study was performed and general foreign and US longwall move practices were documented. Subsequently, four US longwall moves were studied using existing records and on-site time and method studies. These moves were analyzed to identify the positive and negative aspects with respect to time, manpower use, cost and safety. Recommendations are made for each of the four moves studied and a cost benefit analysis is performed to determine the economic feasibility of the recommendations. The actual results are compared with projected results determined by a Critical Path Model analysis of a move incorporating the recommendations. General recommendations are made for improving face-to-face move performance.
- Research Organization:
- Ketron, Inc., Wayne, PA (USA)
- DOE Contract Number:
- AC01-79ET14241
- OSTI ID:
- 6805192
- Report Number(s):
- DOE/ET/14241-T2; ON: DE83005958
- Country of Publication:
- United States
- Language:
- English
Similar Records
Handbook for face-to-face moves of longwall equipment
Computerized scheduling of longwall moves
Computerized critical path scheduling of longwall moves
Technical Report
·
Fri Oct 01 00:00:00 EDT 1982
·
OSTI ID:6563272
Computerized scheduling of longwall moves
Conference
·
Mon Dec 30 23:00:00 EST 1996
·
OSTI ID:525962
Computerized critical path scheduling of longwall moves
Conference
·
Mon Feb 28 23:00:00 EST 1983
· Prepr., Soc. Min. Eng. AIME; (United States)
·
OSTI ID:6507035
Related Subjects
01 COAL, LIGNITE, AND PEAT
012000* -- Coal
Lignite
& Peat-- Mining
42 ENGINEERING
420206 -- Engineering-- Mining & Drilling Equipment & Facilities-- (1980-1989)
COAL MINING
ECONOMICS
ENGINEERING
EQUIPMENT
LONGWALL MINING
MINING
MINING ENGINEERING
MINING EQUIPMENT
RECOMMENDATIONS
START-UP
TRANSPORT
UNDERGROUND MINING
012000* -- Coal
Lignite
& Peat-- Mining
42 ENGINEERING
420206 -- Engineering-- Mining & Drilling Equipment & Facilities-- (1980-1989)
COAL MINING
ECONOMICS
ENGINEERING
EQUIPMENT
LONGWALL MINING
MINING
MINING ENGINEERING
MINING EQUIPMENT
RECOMMENDATIONS
START-UP
TRANSPORT
UNDERGROUND MINING