The Thermal-Hydraulic Test Facility(THTF) has completed 29 powered rod blowdowns: 5 with all 49 rods powered, 2 with 2 inactive rods, and 22 with 4 inactive rods. Blowdown tests 175 and 176 were conducted this period. Tests 175 and 176 were the first and second precursors to the Idaho National Engineering Laboratory (INEL) Independent Verification Test 177, which is planned to be run in the THTF later this year. The purpose of these tests was to determine the capability of the THTF to provide specified bundle surface temperatures and heat fluxes under blowdown conditions similar to those which will occur in test 177. A newly installed power programmer was used to alter the bundle power during the blowdowns. The predicted generator response compared very well with the experimentally measured response; the power programmer functioned as predicted.
Research Organization:
Oak Ridge National Laboratory (ORNL), Oak Ridge, TN (United States)
Sponsoring Organization:
USDOE; USNRC
DOE Contract Number:
W-7405-ENG-26
OSTI ID:
6786380
Report Number(s):
NUREG/CR--0415; ORNL/NUREG/TM--271
Country of Publication:
United States
Language:
English

Similar Records

PWR blowdown heat transfer separate-effects program data evaluation report. THTF test series II
Technical Report · Sat Mar 31 23:00:00 EST 1979 · OSTI ID:6308882

Blowdown heat transfer separate-effects program. Quarterly progress report, October--December 1977. [PWR]
Technical Report · Sat Oct 01 00:00:00 EDT 1977 · OSTI ID:5053936

Quarterly progress report on Blowdown Heat Transfer Separate-Effects Program for January--March 1978. [PWR]
Technical Report · Fri Jun 30 00:00:00 EDT 1978 · OSTI ID:7098315