skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Control rod repositioning considerations in core design analysis

Conference · · Transactions of the American Nuclear Society; (United States)
OSTI ID:6781023

Control rod repositioning is a method for minimizing rod cluster control assembly (RCCA) wear in the upper internals area where the guide cards interface with the rodlets of the RCCAs. A number of utilities have implemented strategies for rod repositioning, which often has no impact on the nuclear analysis for cases where the control rods are never repositioned into the active fuel. Other strategies involve repositioning the control rods several steps into the active fuel. The impact of this type of repositioning on the axial power shape and consequently the total peaking factor F[sub Q][sup T] varies, depending on the method in which the repositioning is implemented at the plant. Operating for long periods with all the control and shutdown rods inserted several steps in the active fuel followed by withdrawing them fully from the core results in a shifting of the power distribution toward the top of the core and must be accounted for in the design analysis. On the other hand, an optional plan for control rod repositioning that considers margins available in related design parameters can be devised that minimizes the effects of the repositioning for the reload. This paper summarizes a rod repositioning strategy implemented for a recent reload and some calculated power shape results for this strategy and other scenarios.

OSTI ID:
6781023
Report Number(s):
CONF-901101-; CODEN: TANSAO
Journal Information:
Transactions of the American Nuclear Society; (United States), Vol. 62; Conference: American Nuclear Society (ANS) winter meeting, Washington, DC (United States), 11-16 Nov 1990; ISSN 0003-018X
Country of Publication:
United States
Language:
English